Pre-qualified, pre-financed homeowners assigned to your service area. Milestone payouts that don't depend on chasing collections. Lifetime aftersales handled by us.

Sample project earnings
illustrative
10 kWp· with net metering
Per kWp₱9,000
× 10 kWp₱90,000
+ Mobilization allowance₱20,000
Project total₱110,000
Milestone payout
M1 · 45%₱40,500
Site prep
M2 · 45%₱40,500
Install & commissioning
M3 · 10%₱9,000
Quality holdback · 4 wk

Certified-tier rates · Premier +3%, Elite +6% uplift

We built this around three problems

You shouldn't have to chase collections,
educate every customer,
and juggle six tools.

01Pain

Customers say no to upfront costs.

Without financing, qualified homeowners stall at signing. You lose deals you should be installing.

What we dopartners on tap

5 financing partners pre-wired.

BPI, BDO Network Bank, Home Credit, BillEase, credit-card BNPL. We structure, approve, and disburse.

02Pain

Hours qualifying instead of installing.

Education, bill analysis, financing calls — the sales lift on every deal eats into your install capacity.

What we do100% pre-vetted

We pre-qualify everyone.

SunFit assessment, KYC, financing approval all happen before the lead is assigned. You see install-ready projects only.

03Pain

Tools and partners don’t talk to each other.

Sales in one tool, financing in another, scheduling on WhatsApp. Information loss between handoffs.

What we doone portal

One portal, end-to-end.

Deal intake, design handoff, milestone submission, payout tracking, Quality Score — same system our internal team uses.

What we bring

You bring installation craft.
We bring everything around it.

Pillar 01
5
financing partners

We unlock demand

Flexible financing options remove the upfront-cost barrier. More qualified homeowners say yes.

On tap
BPIBDO Network BankHome CreditBillEaseCredit-card BNPL
Pillar 02
100%
pre-qualified leads

We handle qualification

SunFit assessment, KYC, financing approval — we run the journey before a lead reaches you. You see only install-ready projects.

Included in SunFit
Electricity bill reviewLoad analysisPayment-fit screeningIdentity & address verify
Pillar 03
7
banking days to payout

We pay you fast

Milestone-triggered payouts via PESONet. BIR 2307 issued automatically. No collections to chase.

Cycle time
3-day validation window7-day payment windowPESONet · InstaPayBIR 2307 included

How it works for partners

Predictable cash flow,
protected referrals, real support.

You walk into projects that are technically and financially ready. The rest — financing risk, customer education, aftersales — sits with us for the lifetime of the system.

Payout flow

Paid in three tranches as the work happens — not after collections.

M145%
Site prep
BOM · SLD · workplan
M245%
Install & commission
Energized · reports filed
M310%
Quality holdback
Released 4 weeks later
Validation
3 banking days
Payment cycle
7 banking days
Method
PESONet · InstaPay
BIR 2307
Issued automatically
Pipeline
100%
Pre-qualified leads

Every lead passes SunFit + financing approval before it's assigned. No dead-end consultations.

Protected referrals

Customers you refer stay yours.

Register first in the portal and you're auto-designated as the installer — plus a referral fee on energization.

Lifetime aftersales

Your scope ends at clean turnover.

We commission, file net metering, monitor, bill, and own customer support for the life of the system.

Zero financing risk

We carry the financing risk.

You install, you get paid. Independent of which financing plan the customer picked — or whether they pay it back.

Partner portal

One operating stack, end to end.

Lead intake, design handoff, schedule, milestone submission, payout tracking, Quality Score — all in partners.joinhelios.com.

partners.joinhelios.com
Quality Score
94.2PREMIER
Pending payout
₱847,500
PRJ-2847· Energized · M2 paid
₱432,000
PRJ-2851· Install in progress
₱187,500
PRJ-2862· Site prep submitted
₱94,500

The project roadmap

From lead intake
to energized system.

Four phases · 11 steps · 3 milestone payouts. Numbers below are for a sample 10 kWp project with net metering.

At a glance Helios Partner
Phase 01

Helios sets the project up

1Helios

Lead intake

Helios marketing or partner referral lands the homeowner.

2Helios

SunFit & KYC

Bill review, load analysis, payment-fit screening, identity verification.

3Helios

Financing & disbursement

Plan structured, approved, funds set aside before installation.

4Helios

Customer TOS signed

Project locked in. Helios hands off to the assigned partner.

Phase 02

Partner runs site preparation

5Partner

Engineering site inspection

Validate roof, load, shading. Helios reviews.

6Partner

BOM, SLD & workplan

Bill of materials, single-line diagram, install workplan. Helios alignment review.

M1· 45%
₱40,500
on a 10 kWp NM project
Milestone reached

Site prep complete

Site inspection done · BOM issued · SLD issued · workplan submitted

Validation 3 banking daysPaid via PESONet · InstaPayBIR 2307 issued
Phase 03

Partner executes the install

7Partner

Permits & mobilization

LGU / DU / ERC compliance, crew dispatched.

8Partner

Installation & T&C

PEC-compliant mount, wire, energize. Testing & commissioning.

9Partner

Submit reports via portal

Install report (photos + video) and T&C report uploaded.

M2· 45%
₱40,500
on a 10 kWp NM project
Milestone reached

Install & commissioning

System energized · install report submitted · T&C report submitted

Validation 3 banking daysPaid via PESONet · InstaPayBIR 2307 issued
Phase 04

Helios validates and energizes

10Helios

Helios review

Reports validated via portal within 3 banking days.

11Helios

Energization confirmed

System producing. Net metering filed by Helios with the DU.

M3· 10%
₱9,000
on a 10 kWp NM project
Milestone reached

Quality holdback released

Released 4 weeks after energization · no workmanship-attributable issues

Validation 3 banking daysPaid via PESONet · InstaPayBIR 2307 issued
System energized · aftersales handled by Helios for life

The Partnership Model

Who owns what on every project

ActivityHeliosSolar Partner
Digital marketing & brandOwns
Lead generation (Helios-sourced)Owns
Lead generation (Partner referrals)ReceivesRefers
SunFit & KYC assessmentOwnsSupports
Financing structuring & approvalOwns
Customer contract & TOSOwns
System design & proposalReviewsOwns
Engineering site inspectionReviewsOwns
Permits & local compliance (LGU, DU, ERC)SupportsOwns
Installation, mounting & wiring (PEC-compliant)Owns
Commissioning & net metering filingOwnsSupports
Aftersales: monitoring, billing, warrantyOwnsSupports
Customer collections & financing servicingOwns

Deal Sources

Two ways deals reach you

Both processed through the same workflow and payout system.

Helios-Assigned Leads

  • Generated through Helios marketing
  • Qualified via SunFit & financing approval
  • Assigned by coverage area, capacity, tier, and Quality Score
  • You run engineering inspection → install → turnover
  • Standard milestone payout applies

Partner-Referred Leads

  • Refer a homeowner from your network or field
  • You're auto-designated as the installation partner
  • Helios runs SunFit, financing, design, and onboarding
  • Earn standard install payout PLUS a referral fee
  • Protected: register first in the Portal to retain the project

Payment Structure

Flat per-kWp rate, paid on milestones

Without Net Metering

₱6,500

per kWp installed

Standard rate for systems not enrolled in net metering.

With Net Metering

₱9,000

per kWp installed

Higher rate covers DU coordination and net metering scope.

+ ₱20,000 mobilization allowance per project — covers general mobilization for all pre-install and post-install work.

Milestone disbursement

Three milestones.
Paid on completion.

Validated within 3 banking days of submission. Paid via PESONet within 7 banking days of validation. BIR Form 2307 issued automatically.

45%
45%
10%
M1
Site prep complete
M2
Install & commissioning
M3
Holdback
M1

Site Preparation Complete

  • Site inspection completed
  • BOM issued
  • SLD issued
  • Workplan submitted
M2

Installation & Commissioning

  • System energized
  • Install report (photos + video)
  • T&C report submitted
M3

Quality Holdback

  • Released 4 weeks after energization
  • No workmanship-attributable issues

Partner Tiers

Tiers reward volume and quality

Evaluated on a rolling 12-month window using closed installation volume and Helios Quality Score.

Certified

Entry tier

  • Volume threshold (rolling 12 mo.)Entry tier
  • Quality score requirement≥ 90%
  • Install fee upliftBase
  • Referral fee per closed referral₱5,000
  • Helios-assigned lead priorityStandard
  • Quarterly volume bonus

Premier

25+ installs / 12 mo.

  • Volume threshold (rolling 12 mo.)25+ installs
  • Quality score requirement≥ 93%
  • Install fee uplift+3%
  • Referral fee per closed referral₱5,500
  • Helios-assigned lead priorityPriority
  • Quarterly volume bonusEligible

Elite

75+ installs / 12 mo.

  • Volume threshold (rolling 12 mo.)75+ installs
  • Quality score requirement≥ 96%
  • Install fee uplift+6%
  • Referral fee per closed referral₱6,000
  • Helios-assigned lead priorityFirst look
  • Quarterly volume bonusEligible

Referral fees illustrative. Final rates confirmed in your signed partnership agreement.

partners.joinhelios.com
Dashboard · ACME Solar Inc.
94.2Quality ScorePREMIER
12
Active projects
₱847k
Pending payouts
43
Installs / 12mo
PRJ-2847 · Energized
₱432,000
PRJ-2851 · Install
₱187,500
PRJ-2862 · Site prep
₱94,500

Tools & support

The same operating stack our internal teams use.

Solar Network Partner Portal

Lead intake, project schedule, design handoff, milestone submission, real-time payouts, Quality Score dashboard — one place.

Dedicated Solar Network Manager

A single point of contact, backed by Helios design, engineering, commissioning, DU coordination, and aftersales.

Co-branded marketing assets

"Helios Solar Network Certified Partner" badge, site signage, email templates, proposal inserts, partner directory listing.

Quarterly business reviews

Tier-up coaching, technical bulletins, equipment updates, PEC-aligned best-practice playbooks, partner forums.

What to prepare

Six categories.
~15 minutes.

Selective by design. As a partner, you represent the Helios brand at the rooftop — quality must match the financing and lifetime service we wrap around it.

Nice-to-have

  • · PCAB License (preferred)
  • · Equipment list
  • · Banking info for milestone payouts
01

Business registration

SEC Certificate, latest GIS, Mayor's/Business Permit, BIR Form 2303. Sole proprietors may submit DTI Business Name in place of SEC/GIS.

02

Tax & accounting

Audited Financial Statements for the prior year, plus a sample BIR-registered Official Receipt or Sales Invoice.

03

Engineering team

Affiliated Professional Electrical Engineer (PEE) — name + PRC credentials + Professional Tax Receipt. CVs of engineers and technicians on the install team.

04

Installer team

TESDA NC II–certified installers. At least one Registered Electrical Engineer (REE) assigned per installation.

05

Track record

1–2 years of installing residential and C&I rooftop solar systems, with referenceable past customers willing to verify completed installs.

06

Workforce compliance

Certification of Salary Disbursement covering the install team — confirming employees are paid through proper channels.

Onboarding Pathway

From application to first project — about 4 weeks

Week 1

Application & Pre-Qualification

Submit your application via joinhelios.com/solar-network. Completeness reviewed within 5 business days.

Week 1–2

Accreditation Review

Document review, online interview, and/or office visit. Dedicated Helios accreditation lead assigned.

Week 3

Partnership Agreement

Execute the Solar Network Partnership Agreement — scope, rate card, exclusivity, referral protocol.

Week 3

Platform Onboarding & Training

Solar Network Partner Portal access. Training on install handbook, financing workflow, net metering filing.

Week 4

Pilot Project & Activation

Run a pilot install under joint supervision. Meet benchmarks → fully activated as a Certified Partner.

Apply to the network

Ready to grow
with Helios?

15-minute application. Completeness reviewed in 5 business days. Fully activated as a Certified Partner in about 4 weeks.